|
|
|
|
|
by pstuart
2137 days ago
|
|
Air conditioning should be powered on site when possible. In a different timeline we would have programs for zero interest loans for solar power installations with payments managed through the power company (trading paying for power to paying for the loan to generate the power). |
|