|
|
|
|
|
by owenmarshall
2146 days ago
|
|
Hah! Good math. Based on the switch placement and the building being more of a rectangle I figured "north side or south side" would be as close as I could get. And when we really dug in it was a classic last mile problem: the first several core switches were well known, we just needed to figure out where the last aggregate switch went. Turns out a door was closed and a new one built to a hallway to another hallway and not properly labeled on the updated drawings. Had one of the boxes running a conveyor belt not have died, we'd never have looked. |
|