As I mentioned in another comment, Ontario could stand to build another 2500-3000MW with of nuclear to deal with the base load, and the variable demand could then largely be dealt with using hydro-electric.
Looking at Ontario's numbers, I see no way in getting 11,000MW of renewal power to replace nuclear connected to the grid, regardless of how many interconnects are set up to other jurisdictions (especially the population is concentrated in the south, and so there's be a high concentration of connections).
Ontario has quite a few turbine farms itself, spread over a reasonable wide area, and even then variability is high:
https://www.zdnet.com/article/why-baseload-power-is-doomed/