Hacker News new | ask | show | jobs
by berdon 2150 days ago
Is that from experience?

Generally all contractors say "the next guys will take care of that". For example, when framing you don't really care if the studs are really straight or if the walls are square. The "next guy" will take care of that.

True enough, when I was drywalling I had the builder come back to take care of some bowed studs that should never have been used.

I've also volunteered at Habitat for Humanity and can confirm that very little "accurate measuring and cutting" was occurring. They'd quickly measure some things, shout out numbers, and then use a circular saw to rough cut it out. But that was it - they didn't refine it after that and went about their merry way.

I have to believe that the accuracy of a foundation is more important but I think it's a fool's dream. They get "close" and they're checked out before the "next guy" has to fix it.

1 comments

Maybe I am just bad at it but I can't get anything done DIY to fit properly. It's always off by like 1-2mm which means holes don't align, there's a gap in the baseboard, etc. I have to throw the entire part away and then pay someone to do it properly.

Unless a 3d printer or CNC machine is responsible for the accuracy you better count me out.

Ah, I did pay someone to do the millwork and trim work. You need a very accurate miter saw and a lot of experience to make perfect niters. I’m getting there but I still get off by a 1/16tb” to a 1/32nd” often.

The finish work is the final last guy. The guy that did our trim would randomly yell out swear words every 20 minutes. His life is hard. And he was expensive.