|
|
|
|
|
by cyb_
2152 days ago
|
|
The Captain/Engineer analogy later on also has a similar problem. In my experience, engineering is always a major stakeholder in a (healthy) product roadmap. They often have good ideas for how to shape the product, they define what is feasible/costly, and have to build it in the end. On a ship, I don't imagine that engineering would be very involved in helping to set the direction, but I could be wrong. |
|
On a warship at least, engineering would make inputs into command decisions, at least by identifying constraints such as when maintenance is required, redline limits, etc.
In fact the Kirk / Scotty relationship (as per classic Star Trek) is a fairly good model, except that there would be multiple Scotties, representing other functions such as damage control, weapons teams, etc. These different teams would have to mutually deconflict, e.g. scheduling maintenance / repair around critical warfighting activities.