Hacker News new | ask | show | jobs
by tomohawk 2180 days ago
The main problem I've seen with scrum is that everything can get put into the backlog, and the backlog becomes infinite.

Then, development becomes ticket driven instead of engineered.

I have seen scrum used successfully where an engineering process was placed in front of the backlog ala Feature Driven Development.

There is a ticketing system, but it is kept separate from the work planning system.