|
|
|
|
|
by tomohawk
2180 days ago
|
|
The main problem I've seen with scrum is that everything can get put into the backlog, and the backlog becomes infinite. Then, development becomes ticket driven instead of engineered. I have seen scrum used successfully where an engineering process was placed in front of the backlog ala Feature Driven Development. There is a ticketing system, but it is kept separate from the work planning system. |
|