|
|
|
|
|
by mdturnerphys
2197 days ago
|
|
That's a good reference point. Cost for infrastructure projects usually isn't linear. I've seen an exponent of .6 used to extrapolate costs. (3140km/27km)^.6 * $4.75B = $82B. Adjusting for inflation gives you something a bit over the $100B. They probably came up with the number in a similar fashion. Do you know if your number includes the detectors? They would have contributed significantly to the total cost. |
|