|
|
|
|
|
by webdva
2245 days ago
|
|
It is ultimately, in a certain sense, a mathematical optimization problem to determine the optimal configuration of the entire infrastucture of additional power sources. Perhaps like finding the optimal location position set of cell phone towers, perhaps using k-means clustering. Furthermore, additional issues must be resolved like legal regulations compliance—the decision maker or engineering agent has preferences or desires to satisfy. |
|