|
|
|
|
|
by zerzar
2257 days ago
|
|
Optimizing scheduling in a system that is already at or over capacity (i.e. double bookings) is a very challenging problem and we don't claim to solve that problem. It would require manual user input which doesn't work very well. Instead, we focus on solving rearranging meetings based on urgency and also to optimize for individual focus time |
|