Hacker News new | ask | show | jobs
by masonic 2318 days ago

  it was able to fulfill a variety of roles from deploying and repairing our own satellites... as well as capture of enemy satellites.
It was a ridiculously expensive and unsafe way to accomplish its missions. The primary contract award to Rockwell was based on a pack of lies with respect to costs.

One direct result is the Challenger disaste. The losing bid would have had the boosters built in one piece and transported on barges. Instead, Thiokol had to make them in pieces small enough to transport by rail.

Cost per flight ended up being, what, two orders of magnitude more than what the basis for the bid award?

1 comments

This style of quotation is difficult to read on mobile.