|
|
|
|
|
by trhway
2323 days ago
|
|
I'd hope that it takes more than 2 months for specs at Boeing. No, we don't write the specs that long, if any. I mean that would be so w-word. In our case while usually almost everybody is on the same page that legs should be attached lower and hands - higher, the actual attachment points and number of the legs, hands, etc. may be pretty fluid through the iterations, and especially the things like number and topology of digits or the shape, number and location of eyes and other sensors. |
|