|
|
|
|
|
by wolfgke
2338 days ago
|
|
I am no native speaker of English, but at > Skunk works can sustain, at max manpower. It is bureaucratic waste with minimum productive output. to me, "it" seems to refer to "[s]kunk work" and referring to skunk work with respect to "max manpower" does not sound like skunk work to me, but throwing lots of cooperate ressources (instead of a small elite team) at the project. |
|
> With the F35 budget well over a trillion dollars (this is 2-3 orders of magnitude larger than needed to fund maximum number of projects Skunk works can sustain, at max manpower), it is a bureaucratic waste with minimum productive output.