some supply simply cannot reduce quickly (e.g. nuclear) What is it about nuclear that makes it impossible to reduce as fast as gas or coal? From my layman's point of view, they all use comparable (steam) turbines to power the actual generators, so I would expect them to be equally capable of disengaging the generator from the turbine. Is this perhaps due to design decisions, or simply a size problem? A foolish question perhaps, but I don't have more knowledge to draw from. |
|
Beyond shutting down slowly, nuclear reactors are even slower to start up again. So after a complete shutdown it can take up to two weeks to put a reactor back into full production.
It is conceiveable to build nuclear reactors which are a bit quicker to ramp up and down - I guess more like the reactors of nuclear submarines, but our existing reactors are not suiteable for that, as this was not a requirement when they were designed. They were designed to be combined with quicker providers like gas and water plants.