|
|
|
|
|
by squilliam
2431 days ago
|
|
Less than a year according to the US Army and Microsoft. >The IVAS Prototype Project seeks to provide a HUD 3.0 and integrated STE Squad capability within the
Squad Architecture in support of Army, Marines, and Special Operations Forces within 24 months. The
PPA shall deliver a baseline standalone STE Squad capability within 12 months, and STE Squad capability
integrated into HUD 3.0 within 24 months. This complete IVAS capability shall be suitable to begin
production as early as 4Q20 to ensure clear overmatch in Close Combat engagements and drastically
increase Squad Lethality. [0]https://uploadvr.com/hololens-microsoft-army/ |
|