|
|
|
|
|
by MrFlynn
2445 days ago
|
|
And the current estimated cost of that hsr system exceeds the estimated cost of the entire 520 mi (840 km) phase 1 system in California. Imagine scaling the cost of a similar design to travel the distance from SF to LA, ignoring the fact that the Japanese tend to build these grand infrastructure projects far more cost effectively than we do. |
|