"The auction cleared at £45/MWh (1). This means that the bids referenced in the Bloomberg story have succeeded. Bloomberg have significantly updated their story to reflect the results. In today’s good news story, we can change “may” to “will” in the headline to match the updated story :)
(1) https://twitter.com/mliebreich/status/1175080738116571136?s=...
"
Skimming https://en.wikipedia.org/wiki/Wind_power_in_Germany it sounds like there is just a perpetual lag, where offshore wind is built and then it takes awhile to get it hooked in. It's been going on since at least 2014, and since that time like 5GW of offshore wind looks to have been hooked up, so I'm not sure there's a problem beyond "things take a while to build".
"The auction cleared at £45/MWh (1). This means that the bids referenced in the Bloomberg story have succeeded. Bloomberg have significantly updated their story to reflect the results. In today’s good news story, we can change “may” to “will” in the headline to match the updated story :) (1) https://twitter.com/mliebreich/status/1175080738116571136?s=... "
As mentioned by daveoflynn elsewhere in these comments https://news.ycombinator.com/item?id=21028451