Hacker News new | ask | show | jobs
by myspy 2509 days ago
The carpenter we did choose ordered here http://www.clt.info/

Walls in the hallway and storage rooms are left exposed as well as one wall in the kids rooms.

The living and sleeping rooms are covered by clayslabs and in-between the electrical cables are placed. Everything is plastered then with clay“stuff“.

We hope that clay will help to control the climate.

The cables are put through the walls to install switches in the hallways.