by astanway
2538 days ago
|
|
Utility scale batteries are not yet a proven and deployed technology. Not to say there aren’t successes - Aliso Canyon and the AEMO installation in Australia have both been very well received by their respective system operators. But there’s a very long way to go before batteries will exist as a viable, general alternative to natural gas peaker plants. |
|
There is about ~1GWh of grid scale battery storage already deployed in the US alone. 150MW was deployed in 2019 Q1 - which represents 232% growth YoY . ~5 GWh is projected to be installed annually by 2024. [1] I think that this qualifies as proven and deployed.
[1] - https://www.woodmac.com/research/products/power-and-renewabl...