|
|
|
|
|
by sunkensheep
2554 days ago
|
|
To connect two regions, we align the phase of the two islands. As the voltage across our switch bank falls to zero, we close the switches. It's not a big difference from between synchronizing a generator. The phase is aligned by requesting small changes to generator output, and measurement is done by synchrophasor. |
|