|
|
|
How to cope with excessively long retrospective meetings
|
|
1 points
by testbotlo2
2649 days ago
|
|
We've been doing Kanban for some time and the retrospective meetings are taking at least 1-2 hours. Adding that to the validation/general overview meetings, I'm at the point that the entire morning is spent doing not-so-useful meetings. At the end I feel my brain is completely drained. How should I cope with such horrendously long meetings? |
|
After all, you are paid for the time spent on meetings, so it's not you, but the business is the entity which should bother about productiveness of your time.