Hacker News new | ask | show | jobs
by lewi 2650 days ago
> An ant farting in a hurricane.

Thats a touch disingenuous. It was never meant to power the whole of South Australia. It was specifically built to mitigate the peak power price gouging [0] that had been happening the for prior 10 years.

The 6 minutes it can run for during each cycle saves millions of dollars a year. Specifically 40mil in the first year. The cost of the unit was 66 Mil [1], so thats an insane break even time for grid infrastructure.

[0]: https://reneweconomy.com.au/tesla-big-battery-powerless-to-s... [1]: https://interestingengineering.com/tesla-battery-installed-i...