|
|
|
|
|
by talldan
2771 days ago
|
|
I don't think you need to drill tunnels. That hasn't happened (much) in London, yet there's been a marked improvement in the core service over the last 20 years. London's network is older and has smaller tunnels. It also only has single tunnels in each direction (so if a train breaks down the whole line stops). The difference is that the network has had steady investment under single management for a prolonged period. Londoners have suffered through closures for engineering work, but ageing systems have been upgraded and gradually the benefit is being felt. |
|