|
|
|
|
|
by annywhey
2852 days ago
|
|
There's a lot to be said for a "keep moving" approach to project work. I'm a worrier with a perfectionist streak, but I do better with multiple projects because I ruminate less on each one: If I cycle through them over the course of a day, I forget what I was worried about and just focus on accomplishing something I had put in the to-do, which levels things out and lets me do more work at less than 100% when it's called for. When I do work at 100% it means I'm destroying myself trying to calculate every possible option. The 100% work only needs to come out some of the time. |
|