|
|
|
|
|
by verall
2853 days ago
|
|
Computer hardware has a very long lead time between product concept and metal-in-your-hand. Combined with the pains and huge initial slowdown of a megacorp purchasing a medium-corp, I think the real fruits of that acquisition are yet to be seen. I bet it took at least a year just for management to get their bearings on straight. I would have guessed additional lead time for Altera to move their designs from TSMC to Intel process, but it looks like Altera has been planning to fab on Intels 14nm since 2013[0]. [0]http://chipdesignmag.com/display.php?articleId=5215 |
|