|
|
|
|
|
by zaarn
2882 days ago
|
|
And then you'd still have to switch over and you'd need a sync check relay for safety (if you don't and the microcontroller is off because you forgot a comma somewhere, your inverter explodes). Additionally producing the clean sinewave that you'd need for this is not that easy, atleast not at the quality levels you want for this (if your DAC that produces the wave is off by 1% then at a 2kW load you're going to burn up 20W somewhere that doesn't like 20W being burned up) |
|
How is being off by 1% going to hurt anything? I'm quite sure my mains voltage is already more than 1% off.
If I get solar it had better not explode every time my air conditioner kicks on.