From the indictment: 27. HENRY's rushed schedule affected quality control. A steel detailer named Ronald Miller, who was hired to assist with the Verrückt construction, emailed Project Manager Kathrine Fontenot to voice his concerns: "I'll be honest with you. We were forced to ship this [tower platform] way to early. There are still so many unknowns. We would have saved a lot more time (and money) if everything was figured out here at the plant. I have been telling people for months that it was imperative to have all of this stuff figured out prior to shipment. My requests fell on deaf ears and now it is on its way up to KC to be galvanised. Instead of dealing with these questions in a controlled environment, where we have the material and resources to resolve these matters, it is going to have to be done on the fly 160' in the air, on a structure that is galvanised." |
|