Depends. Are you taking into account reconfiguring bridges and overpasses to make the loads fit, or factoring traffic management costs into the equation? The truckloads of concrete to make a structure individually take up a lot less space and weigh less than the final structure itself.
I've wondered about that of late. Assuming that fitting stone work was is a skilled craft. But with modern CNC technologies might be worth a look again.