by hinkley
3075 days ago
|
|
In a waterfall organization many of those due dates are months out. Finish and deliver don’t have to be the same thing. Especially when features depend on each other. A group of unaffiliated contractors slipped kanban into Boeing in part because we never said what we were doing. But every time there was a hiccup we proposed another kanban process. WIP limits took a while but saved a lot of headaches. If we are over the limit and you finish a story you had to help someone else or get a special dispensation for the leads (sometimes we had stories that depended on other teams and the next story was straightforward). It is by far the biggest silent conspiracy to do good that I ever participated in. Unfortunately after we got reported into a sustaining team there was some peer to our manager who would not shut up about Scrum. If you’ve done Kanban, Scrum is like when your parents make you hang out with your kid brother’s friends. |
|