Hacker News new | ask | show | jobs
by ghaff 3117 days ago
An engineering manager I used to work with would drive me crazy. He had this "methodology" he referred to as a 90% schedule but it was a 90% confidence schedule only in the sense of no one ever getting sick for a couple of days, tests not failing, no hardware being defective, etc. etc. It won't come as a surprise that this schedule was basically never met.