|
|
|
|
|
by threesevens
3215 days ago
|
|
It was a good friend of mine that was 50/50 partner, but ended up choosing to work on another project instead. I was left with 80% of an MVP, so I hired a contractor out of pocket to finish up. I'm a VP of Sales at a startup, and have done the design, product fit, and selling. Literally everything aside from coding. |
|
> ...I hired a contractor out of pocket to finish up.
?
Also, if your friend gave you 80% of an MVP without any compensation, watch out: You might not actually own that 80% of an MVP.