Hacker News new | ask | show | jobs
by ethagknight 3216 days ago
Eh it is wholly true. Distributed detention schemes still have a finite volume of containment, and once the detention zones are saturated, those areas behave equally to pavement for each additional unit of water. 50 inches of water across the majority of Texas with severe storm surge cannot be practically prepared for beyond insurance, evacuation, and/or a boat. To say “it was avoidable” is a strong and expensive assertion requires some hard backup. Heres an introduction to runoff coefficient (disclaimer! exciting stuff!). Everything is based on a “design storm” with a specified duration and intensity, where those two variables lead to a sigmoid curve (as i recall) for runoff, or the greater the intensity and longer the duration, the less water that gets detained. http://www.brighthubengineering.com/hydraulics-civil-enginee...