by mschuster91
3221 days ago
|
|
> (One thing nuclear does not cause) However, two problems remain: 1) where to get the raw material? African mines are not exactly known for adhering to human or environmental rights, also African mines, by nature of being in Africa, don't create American jobs. Same is valid for the other major sources of nuclear fuel, all of which aren't the USA. 2) where to dump all the nuclear waste? I mean, people have debated to put in the most long-living and nasty stuff into special reactors to get it split up to less harmful stuff, but to my knowledge this has never been realized - and NIMBYs are highly afraid of a rad-waste dump near their houses, across the world. Also, no one has shown how to build something that can last over ten thousands of years while still protecting the rad waste. |
|
As for nuclear waste, the real reason why the problem appears intractable is that nuclear waste is not waste.
The LWR gets only 2% or so of the energy in uranium, the same fuel could be reprocessed and used in fast breeder reactors to release the other 98%. In fact, it is the presence of plutonium and other actinides in spent fuel that requires environmental isolation beyond 500 years or so. If we use those actinides as fuel, they do not need to be buried, and if we do that, the volume of waste is vastly reduced along with the half-life.
The fast breeder/reprocessing route has not been commercialized as of yet for a number of reasons. Probably the most discussed is that plutonium, neptunium and other actinides useful for nuclear weaponry could be nicked from the reprocessing plant.
The thorium MSR is an alternate path to a breeder, aka a "thermal breeder". In the case of the MSR, the reprocessing is done online or nearline to the reactor. It is also possible to do thermal breeding with thorium with a modified version of the light water reactor. Reprocessing that is a bitch though...
The most immediate problem facing the industry is an inability to say "it is going to take X years and Y dollars to build a reactor" and then finish it somewhere near on schedule and on budget. Being over 10% would be no scandal, but it is still looking more like 10x than 10%.