Y
Hacker News
new
|
ask
|
show
|
jobs
by
lmm
3256 days ago
And then you end up spending far more on powerlines than it would cost to get working fusion.
1 comments
sandl
3256 days ago
Not really - ITER alone is expected to be in excess of $20 billion, that would buy you about 20 modern HVDC Transmission lines, each with a length of 1000 km and able to transmit 40 GW of power in total. That's a lot of power. :-)
http://electrical-engineering-portal.com/analysing-the-costs...
link
http://electrical-engineering-portal.com/analysing-the-costs...