|
|
|
|
|
by cpsempek
3267 days ago
|
|
Not that I know either, but the quality control process is possibly a source of much cost of production. Every part must pass a series of tests during and after production before deemed ready for sale. Every failure of a test costs time and money. These yield rates are either low with low cost manufacturing, or, high with high manufacturing costs. This could be part of it. |
|