|
|
|
|
|
by lochieferrier
3278 days ago
|
|
NASA Helios was quite expensive and tricky to build, with not a lot of margin left for useful payload. There's a weight runaway that occurs with solar powered aircraft, look at Fig 12 in this report: http://hoburg.mit.edu/publications/gassolar.pdf Disclaimer: I worked on this project, so am super biased. |
|
Edit: just got a chance to look at the report. Thanks for the link, there are some really interesting findings in there.