Not scrum-specific, and I don't recall whether it was backed by academic research, but one of the rules in XP is that estimates longer than 3 weeks were (more) unreliable. So if the estimate was longer than 3 weeks, you had to break it up into chunks, each of which was 3 weeks or smaller.