|
|
|
|
|
by snowwindwaves
3344 days ago
|
|
Reservoirs filling with silt may reduce storage which would turn the dam in to a run of river plant. Less control over when the electricity is made. Also reservoirs could be dredged out to allow the silt to continue its way downstream. |
|