|
|
|
|
|
by jasonpeacock
3398 days ago
|
|
Let's assume you have 3 engineers, one 10x and two 1x, their total output is: 10x + 1x + 1x = 12x Now you convert that 10x engineer into a 10x multiplier, and let's assume he doesn't actually do real work anymore because he's helping everyone else be more productive: 0x + 10x + 10x = 20x He may no longer be doing any work, but the rest of his team is more productive and significantly outstrips his own individual output. That's some very impressive made-up math! Obviously the real world is not so simple, but the effect is the same. There's the engineer that cranks out a crazy amount of code and nobody can keep up, and then there's the engineer that helps everyone else crank out more code - now everyone is learning and increasing their output. Which would you rather have on your team? |
|