by zonywhoop
3478 days ago
|
|
Having designed and run colo data centers for many years my rule of thumb for calculating this for customers was to use the vendors tools if available or take 80% of power supply rating. Keep in mind that most servers will have a peak load during initial power on as the fans and components come online and run through testing. If a rack ever comes up on a single channel and the circuits are not rated right that breaker will just pop right back offline and you'll have to bring it up by unplugging servers and bringing them up in sets. Also most breakers are only rated at 80% load so you have to de-rate them for your load. So, e.g., a 20amp x 208 3 phase circuit really only has 8KW of constant power draw available. |
|