I didn't even read that far :0 The point of my comment was their lack of understanding of how the existing transmission system is connected to their neighboring regions. This is the base infrastructure of the electric energy market (long term, day ahead, and spot markets). These interconnects between regions (grids) requires that frequency is in synch and any deviation will cause a disconnect.
VFTs are cool